We’re excited to announce that we’re continuing with the revitalization of Drew Park!

After our last round of engagement, changes in project funding meant we had to put things on a short pause. Since then, we’ve secured the funding to finish the design work and proceed with construction in 2026.

Park design is now finalized!

Here’s what we’re expecting:

  • Summer/Fall 2025 – Designs prepared for public engagement
  • Fall/Winter 2025 – Finalization of a preferred design and share with public
  • Winter 2025/2026 – Tendering process
  • Summer 2026 – Construction begins

About Drew Park 

Drew Park is a 0.29 hectare (0.72 acre) neighborhood park located at 29 Drew Street in the East Willow neighbourhood. The park was dedicated to the memory of George Alexander Drew who, among many other things, was the City’s youngest mayor at age 30. The park currently features a playground, two basketball nets, bench seating, large unprogrammed grass areas and many mature trees. Lots of the park elements are outdated and have reached the end of their serviceable life, so they’re ready for replacement. 

Drew Park Satellite Map

Located at 298 Drew Street, Guelph 

Drew Park is a Neighbourhood Level Park as defined in our Parks and Recreation Master Plan

Neighbourhood parks are the building blocks of the park system. Neighbourhood parks are typically smaller, local parks that serve the needs of one neighbourhood. They include play areas, recreation amenities and green spaces that are close to people’s homes. They are meant to be easily walked to (500- 800 metres) so people can enjoy unorganized, unstructured and spontaneous activities. 

Check out our summary report to learn more about what we heard and what we're doing.

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening

Phases

Phases overview
Ideas engagement - Spring 2024
Review feedback - Summer 2024
Design engagement - Summer 2025
Review feedback - Fall 2025
Final design - Fall 2025
Construction - Summer 2026

Construction - Summer 2026

July 1, 2026 - October 31, 2026

We will complete the construction drawings, initiate the tendering process, and proceed with construction.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Event date and time

      Event date: July 24th, 2025 from 6:30 PM to 7:45 PM.

      Location

      Norm Jary Park

    1 event has loaded.