Exhibition Park Neighborhood Infrastructure Improvements

This consultation is now complete.

About the study 

We have conducted a study in the Exhibition Park neighbourhood to enhance the park's infrastructure to manage flooding, upgrade aging systems and address ongoing challenges we have heard about from the community. 

We have developed recommendations to address some of the infrastructure needs while planning for long-term sustainable development and efficiencies. The study looks at upgrades to sanitary sewers, watermains, stormwater sewers, and surface works identified in the Water and Wastewater Servicing Master Plan, the Stormwater Management Master Plan, and through asset management planning. 

This included collecting field information (i.e. a topographic survey and soil information), evaluating design alternatives, and developing preliminary designs to inform detailed design and construction. 

Exhibition Park study area

Study Area

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening

Colleen Gammie

Colleen Gammie , Infrastructure Planning Engineer 

colleen.gammie@guelph.ca 

Kelly Guthrie

Kelly Guthrie, Community Engagement Advisor, City of Guelph

kelly.guthrie@guelph.ca


Phases

Phases overview
Project research and study period
Challenges and opportunities survey
Development of alternatives
Potential options survey
Preferred alternative and preliminary design
Preferred solutions survey
Results

Results

December 15, 2025 - No end date

The study is complete and has recommended a program of works in the Exhibition Park Neighbourhood Area that will be undertaken in several detailed design and construction phases, as shown in the map below. The timing of each phase will be set and confirmed annually through the capital budget. These projects will be communicated to the neighbourhood as they are scheduled to begin and further engagement, should it be required on any of the projects in the program of works, will be included in communications. 

A map of the streets surrounding Exhibition Park showing a 9-phase program of works

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Event date and time

      Event date: February 11th, 2025 from 6:30 PM to 8:00 PM.

      Location

      Victory Public School

    • Event date and time

      Event date: October 8th, 2024 from 4:00 PM to 6:00 PM.

      Location

      Guelph City Hall

    • Event date and time

      Event date: June 24th, 2024 from 4:00 PM to 6:00 PM.

      Location

      70 Division Street

    3 events have loaded.