Gordon Street and Clair/Laird Road Class Environmental Assessment

As part of this project, we’re studying how to design the roads people will rely on as part of their everyday lives. This includes widening three arterial roads from two to four lanes, as well as enhancing the cross section to support all road users. 

Based on recommendations in the Clair Maltby Master Environmental Servicing Plan (MESP) and the Transportation Master Plan (TMP), this project includes a Schedule C Class Environmental Assessment for the study area of Gordon Street, from Clair Road to Maltby Road; Clair Road, from Victoria Road to Laird Road; and, Laird Road, from Clair Road to Highway 6. The study will follow the processes outlined in the Municipal Class Environmental Assessment (MCEA) document, last updated in 2024. 

Map of study area

How can I participate right now?

If you were unable to make it to the open house on March 10, you can also view the boards below.

If you have any questions about this project, please reach out to the project team!

Further reading

Phases

Phases overview
Phase 2: Alternate design concept development
Alternate design concept development
Phase 3: Alternative design concept engagement
Alternative design concept engagement
Phase 4: Alternative design concept evaluation
Alternative design concept evaluation
Phase 5: Preferred design concept engagement
Preferred design concept engagement
Phase 6: Environmental study report
Environmental study report

Project background

March 4, 2025 5:00 AM - August 1, 2025 4:00 AM

This phase of work included the project initiation as well as the collection of background data in the field and from previous work completed in the area, notably the Clair Maltby Secondary Plan, Master Environmental Servicing Plan, and Comprehensive Environmental Impact Studies.

This project is being completed as a Schedule “C” project in accordance with the Municipal Class Environmental Assessment (October 2000, amended in 2007, 2011, 2015, 2023 and 2024). In developing recommendations, the study will consider technical, economic, cultural heritage, social and natural environmental factors. 

0 questions

No results found. Please try a different filter or search term.

Filters

Total posts: 0
There are no projects available.

Sorting changed to: Trending

No values available.

Selected zero tag filters.

Events

Past events

  • Event date: October 21st, 2025 at 10:30 PM to October 22nd, 2025 at 12:30 AM.

    Location

    Aberfoyle Public School

    Registrants

    2 registrants

  • Icon of a calendar with a star on one of the dates

    Event date: March 10th, 2026 at 10:30 PM to March 11th, 2026 at 12:30 AM.

    Location

    Bishop Macdonell Catholic High School