Skip to main content
Guelph street near Gordon and Clair with sidewalk, grassy area with dandelions, brick wall separating houses, cars on the road, and overcast sky with power lines overhead.

Gordon Street and Clair/Laird Road Class Environmental Assessment

As part of this project, we’re studying how to design the roads people will rely on as part of their everyday lives. This includes widening three arterial roads from two to four lanes, as well as enhancing the cross section to support all road users. 

Based on recommendations in the Clair Maltby Master Environmental Servicing Plan (MESP) and the Transportation Master Plan (TMP), this project includes a Schedule C Class Environmental Assessment for the study area of Gordon Street, from Clair Road to Maltby Road; Clair Road, from Victoria Road to Laird Road; and, Laird Road, from Clair Road to Highway 6. The study will follow the processes outlined in the Municipal Class Environmental Assessment (MCEA) document, last updated in 2024. 

Map of study area

How can I participate right now?

If you were unable to make it to the open house on March 10, you can also view the boards below.

If you have any questions about this project, please reach out to the project team!

Further reading

Phases

Phases overview
Project background
Alternate design concept development
Alternative design concept engagement
Alternative design concept evaluation
Preferred design concept engagement
Environmental study report
Public review

Alternate design concept development

August 1, 2025 - October 20, 2025

The Municipal Class Environmental Assessment process includes five phases the first two, which are complete are:

  • Phase 1 – Develop the Problem/Opportunity Statement, and
  • Phase 2 – Develop and Evaluate Alternative Solutions were completed in 2023 as part of the Clair Maltby Secondary Plan Master Environmental Servicing Study.

This project is now moving forward with Phase 3 – Alternative Design Concepts – where we look at the solution identified in Phase 2 and go into greater detail based on existing conditions and future needs. This phase of work includes preparing different Alternative Design Concepts. 

If you have any questions or comments please click the button below.

Ask us anything!

1 question

Filters

Total posts: 1
There is 1 project available.

Sorting changed to: Trending

No values available.

Selected zero tag filters.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Icon of a calendar with a star on one of the dates
      Event date and time

      Event date: March 10th, 2026 from 6:30 PM to 8:30 PM.

      Location

      Bishop Macdonell Catholic High School

    • Event date and time

      Event date: October 21st, 2025 from 6:30 PM to 8:30 PM.

      Location

      Aberfoyle Public School

      Registrants

      2 registrants

    2 events have loaded.