Skip to main content
Playground swings and sandbox graphic with red block on right side
Unfortunately, you can't participate in this project anymore because it has been archived

Playground replacements 2024

Thank you for your feedback!

Based on the valuable feedback from our design engagement, we have created the final playground designs and are now preparing construction drawings.

Check out our engagement summary report to learn more about what we heard.

Final designs

Check out the final designs for each park!

Construction is set to start in summer of 2025. Watch for the new playgrounds to be open later this year.

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening

Jude Gadboury

Jude Gaboury, Project Manager, Parks

jude.gaboury@guelph.ca

Jennifer Bucci

Jennifer Bucci, Community Engagement Coordinator

jennifer.bucci@guelph.ca

Phases

Phases overview
Colonial Drive Park survey
Holland Crescent Park survey
Highview Park
Design consideration
Under review
Colonial Drive Park design survey
Holland Crescent Park design survey
Highview Park design survey
Design consideration
Final designs released
Construction

Highview Park

November 4, 2024 - November 10, 2024

Call to Action / what we did

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vivamus lacinia odio vitae vestibulum vestibulum.


Take the survey

Section separator

Secondary section if appropriate (Good for report sharing)

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent commodo cursus magna, vel scelerisque nisl consectetur et. Nulla vitae elit libero, a pharetra augue. Donec id elit non mi porta gravida at eget metus. Curabitur blandit tempus porttitor. Integer posuere erat a ante venenatis dapibus posuere velit aliquet. Cras mattis consectetur purus sit amet fermentum.

Read less