Playground replacements 2025

Help us design three playgrounds we’re replacing by summer 2026

We took what we heard from our first round of engagement and designed 2 options for each park. Before we finalize designs, we want to hear from you! What elements and features do you prefer?

Between November 26-December 17, please take some time to complete a survey (or three!) and share your thoughts on one or more of these playgrounds:

  • O’Connor Lane Park (31 O’Connor Lane)
  • Severn Drive Park (125 Severn Drive)
  • Woodland Glen Park (30 Woodland Glen Drive)

Need inspiration? Check out Imagining your next playground below for ideas and conversation starters.

We want you to tell us:

  • Which layout do you prefer?
  • Which options have the best elements and colour schemes?
  • Which playground designs have the best inclusive and accessible features?

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
178 participants

Who's Listening

Stefan Ilic, Project Specialist

stefan.ilic@guelph.ca

City of Guelph

Jenn Bucci

Jenn Bucci, Community Engagement Coordinator, City of Guelph

jennifer.bucci@guelph.ca

Phases

Phases overview
O'Connor Lane Park survey
Severn Drive Park survey
Woodland Glen survey
Under review
Design consideration
Phase two open - design options
Design consideration
Final designs released
Construction

Under review

April 6, 2025 - April 20, 2025

Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.

What's next?

After gathering and analyzing all the feedback from our engagement efforts, we'll use this data to establish the requirements for new play equipment designs. We will then collaborate with specialized playground designers to create these new designs. Once the design options are finalized, we will choose the top two designs for each park to present to you. The designs that receive the most votes will be implemented during construction. Don't forget to subscribe to stay updated and informed.

Final designs and plans for construction will be shared in the Fall of 2025, with construction starting Summer 2026.