Playground replacements 2025
Help us design three playgrounds we’re replacing by summer 2026
We took what we heard from our first round of engagement and designed 2 options for each park. Before we finalize designs, we want to hear from you! What elements and features do you prefer?
See a 3D model of each playground below or go to Phase 8: Final Designs released to see the final designs for each playground.
We asked you:
- Which layout do you prefer?
- Which options have the best elements and colour schemes?
- Which playground designs have the best inclusive and accessible features?
Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening

Stefan Ilic, Project Specialist
stefan.ilic@guelph.ca
City of Guelph

Jenn Bucci, Community Engagement Coordinator, City of Guelph
Phases
Phases overview
Phase 1: O'Connor Lane Park survey
O'Connor Lane Park survey
Phase 2: Severn Drive Park survey
Severn Drive Park survey
Phase 3: Woodland Glen survey
Woodland Glen survey
Phase 4: Under review
Under review
Phase 5: Design consideration
Design consideration
Phase 6: Phase two open - design options
Phase two open - design options
Phase 7: Design consideration
Design consideration
Phase 8: Final designs released
Final designs released
Phase 9: Construction
Construction
Phase two open - design options
November 26, 2025 5:00 AM - December 18, 2025 5:00 AM
The surveys for input on design options for O'Connor Lane Park, Severn Drive Park, and Woodland Glen Park are now closed. Thank you for your contributions.