Skip to main content
playground graphic with swingsets, sandbox and red block on the right

Playground replacements 2025

Help us design three playgrounds we’re replacing by summer 2026

We took what we heard from our first round of engagement and designed 2 options for each park. Before we finalize designs, we want to hear from you! What elements and features do you prefer?

Between November 26-December 17, please take some time to complete a survey (or three!) and share your thoughts on one or more of these playgrounds:

  • O’Connor Lane Park (31 O’Connor Lane)
  • Severn Drive Park (125 Severn Drive)
  • Woodland Glen Park (30 Woodland Glen Drive)

Need inspiration? Check out Imagining your next playground below for ideas and conversation starters.

We want you to tell us:

  • Which layout do you prefer?
  • Which options have the best elements and colour schemes?
  • Which playground designs have the best inclusive and accessible features?

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
178 participants

Who's Listening

Stefan Ilic, Project Specialist

stefan.ilic@guelph.ca

City of Guelph

Jenn Bucci

Jenn Bucci, Community Engagement Coordinator, City of Guelph

jennifer.bucci@guelph.ca

Phases

Phases overview
O'Connor Lane Park survey
Severn Drive Park survey
Woodland Glen survey
Under review
Design consideration
Phase two open - design options
Design consideration
Final designs released
Construction

Design consideration

December 22, 2025 - January 30, 2026

Based on what we heard from you in phase 2, we are in the process of creating final designs.