Skip to main content
View of road under construction with excavator in the background and big cement pipes in the front

University Avenue West Reconstruction

The City of Guelph will be proceeding with the reconstruction of University Avenue West (from College Avenue to Gordon Street). Reconstruction will include the replacement of underground utilities and surface works including sanitary sewers, storm sewers, watermains, services to property line, asphalt, curbs, sidewalks and other miscellaneous works.  

The project is needed to replace underground infrastructure at the end of its service life, enhance accessible travel by replacing existing sidewalk with wider sidewalk and infilling the new sidewalk, and to address drainage challenges and better align to with the City’s Master plans.

How can I participate right now?

Attend the drop-in open house on February 11, 2026 from 6:30 - 8:30 at John McCrae Public School.

Let us know if you have any questions or concerns about this project by emailing Steve Huckabone (steve.huckabone@guelph.ca) or posting your question to Have Your Say for a member of the project team to respond to.

Map and Phasing of Construction Area:

A map of University Avenue West with the 2026 Construction Limits from College Ave West to just past Caledonia Street and the 2027 construction limits from Caledonia Street to Gordon Street

Phases

Phases overview
Public Open House
Stage 1 Construction – College Ave to Caledonia Street
Stage 2 Construction – Caledonia Street to Gordon Street
Stage 3 Construction – College Ave to Gordon Street (surface asphalt)

Public Open House

January 26, 2026 - March 4, 2026

During this phase of the project, we will present the design to the public to review impacts to residents, answer questions on the design, and hear feedback on any concerns residents may have during construction.


Public Open House on Wednesday, February 11, 2026

Drop by between 6:30 p.m. to 8:30 p.m.

John McCrae Public School, Library at 189 Water Street, Guelph


You may also share any questions or concerns you have with this project below, and a member of the project team will provide an answer. 

Ask a question

3 questions

Expeditious Completion etc.

Jim Stokes2 months ago
Total likes: 1, total dislikes: 0
. You can no longer react to ideas in University Avenue West Reconstruction. You can no longer react to ideas in University Avenue West Reconstruction
1 comment
proposed

Filters

Total posts: 3
There are 3 projects available.

Sorting changed to: New

No values available.

Selected zero tag filters.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    • Graphic of a calendar with a star on one of the dates
      Event date and time

      Event date: January 21st, 2026 from 6:30 PM to 8:30 PM.

      Location

      John McCrae Public School

    1 event has loaded.