Skip to main content
Three circular photos on a grey background with blue and green lines: the first shows a waterway emerging from a stone tunnel; the second depicts workers operating a large maintenance truck with a crane or vacuum system; the third shows a person working near large tanks in an industrial water treatment facility
Unfortunately, you can't participate in this project anymore because it has been archived

Sewer Use By-law update

In 2024 the updated Sewer Use Bylaw was passed by Council. Thanks to everyone who participated in the conversation.

We're updating the Sewer Use By-law

The aim is to modernize the bylaw to ensure it continues to meet the needs of the Guelph community and aligns with industry best practices. The existing bylaw was adopted in 1996 and hasn't been amended since 2006. Since then, standards have changed and various proposed updates to the bylaw will help the City operate the sewer systems more effectively.

The bylaw helps make sure harmful pollutants (chemicals, oils, fats and grease, etc.) are managed properly to increase the life cycles of the wastewater and stormwater systems, reduce the cost of maintenance and help protect the Speed River and our environment.

This update will ensure the bylaw:

  • aligns with the latest industry standards and best management practices
  • complies with current federal and provincial regulations
  • is more user-friendly and organized in a way that is easy for both residents and City staff to utilize it

Some of the key areas of focus are:

  • requirements for:
  1. food-related grease interceptors
  2. vehicle and equipment service oil and grease interceptors
  3. sediment interceptors
  4. dental waste amalgam separator
  • sanitary and storm discharges
  • update of overstrength agreement formula
  • updated contaminant lists/schedules
  • swimming pools and hot tubs

We expect to bring the updated by-law with the accompanying report to Council in April 2023.

You can also find more information about Guelph's sewer system along with actions you can take to help prevent issues in the sewer system and protect our environment on the right-hand menu of this page.

Please stay tuned to this page for further project information and updates or visit the project page.

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.

Who's Listening

awaiting a headshot

Danielle Anders, M.A.Sc, P.Eng, Project manager, GM BluePlan Engineering Lt.

danielle.anders@gmblueplan.ca

awaiting headshot

Phil McIntyre, C.Tech., CAN-CISEC, Supervisior of Environmental Compliance & Laboratory Services

phil.mcintyre@guelph.ca

Phases

Phases overview
First Round of Engagement
Second Round of Engagement
Under Review
Final report

Second Round of Engagement

October 4, 2021 - October 29, 2021

0 questions

No results found. Please try a different filter or search term.

Filters

Total posts: 0
There are no projects available.

Sorting changed to: Trending

No values available.

Selected zero tag filters.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    1 event has loaded.