The Phase 1: Wyndham Street North Reconstruction project is the first detailed design and construction project in the Downtown Infrastructure Renewal Program. This project was informed by the Wyndham Street Environmental Assessment (EA) and is the first phase identified in the upcoming Capital Implementation Plan (which outlines the construction sequencing).
This project runs in tandem with construction planning and implementation for the fulsome Downtown Infrastructure Renewal Program, and the study and design process for the Macdonell Bridge and Allan's Dam structure project.
Construction along Wellington Street East occurred in the summer of 2025 to lay the groundwork for new infrastructure along Wyndham N. and gas and power utility upgrades have been happening in sections of Downtown to prepare for the larger Construction which began March 30, 2025 and is moving through Wyndham street over the course of the next four months. Construction areas will re-open in stages as roads are complete to a level to allow traffic. All Wyndham Street construction is expected to complete in 2028.

Area of study
This part of the project focuses on the reconstruction of Wyndham Street North corridor, from approximately Farquhar Street to Woolwich Street.
Related projects on Have Your Say
Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening
Reg Russwurm, Manager, Design and Construction, City of Guelph
Vince Pugliese, Technical Manager MTE Consultants
Andrew Miller, Project Engineer, City of Guelph
Phases
Design conditions ideas
What we did
We asked for your fresh ideas for the street design options in the summer of 2023
The community shared their ideas on the cards below and took time to review and "like" ideas shared by their neighbours.
Read our summary of engagement and what we heard in the summer of 2023 to learn about this part of the process and how we are including the community in the design.
52 ideas
Filters
Total posts: 52No values available.
Upcoming and ongoing events
Past events

Event date: March 25th, 2026 from 12:00 PM to 8:00 PM.
1 Carden Street

Event date: September 18th, 2025 from 10:00 AM to 8:00 PM.
St. George's Square
1 registrant

Event date: May 1st, 2025 from 6:00 PM to 8:00 PM.
1 Carden St