Wyndham Street North set up with road-side patios in 2021

Downtown Renewal - Wyndham St. and St. George's Square

A sub-project of the Downtown Infrastructure Renewal Program

The Phase 1: Wyndham Street North Reconstruction project is the first detailed design and construction project in the Downtown Infrastructure Renewal Program. This project was informed by the Wyndham Street Environmental Assessment (EA) and is the first phase identified in the upcoming Capital Implementation Plan (which outlines the construction sequencing).

This project runs in tandem with construction planning and implementation for the fulsome Downtown Infrastructure Renewal Program, and the study and design process for the Macdonell Bridge and Allan's Dam structure project.

Construction along Wellington Street East occurred in the summer of 2025 to lay the groundwork for new infrastructure along Wyndham N. and gas and power utility upgrades have been happening in sections of Downtown to prepare for the larger Construction which began March 30, 2025 and is moving through Wyndham street over the course of the next four months. Construction areas will re-open in stages as roads are complete to a level to allow traffic. All Wyndham Street construction is expected to complete in 2028.

Satellite map of downtown Guelph, highlighting Wyndham Street from Farquhar to Woolwich and the outline of St. George's square.

Area of study

This part of the project focuses on the reconstruction of Wyndham Street North corridor, from approximately Farquhar Street to Woolwich Street.

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

You're viewing real-time data. Participant counts are continuously updated for administrators. Please note that regular users see cached data, which may result in slight differences in the numbers.
948 participants

Who's Listening

Reg Russwurm, Manager, Design and Construction, City of Guelph

reg.russwurm@guelph.ca

Vince Pugliese, Technical Manager MTE Consultants

vpugliese@mte85.com

Andrew Miller, Project Engineer, City of Guelph

andrew.miller@guelph.ca

Phases

Phases overview
Design conditions
Design conditions ideas
Wyndham St. corridor and intersection
St. George's Square design ideas
St George's Square concept design comparison
Wyndham Street and St Geroge's Square revised designs
Wyndham and Square detailed design
Final designs and preparing for construction
Wyndham Street N Construction

Design conditions ideas

July 1, 2023 - July 31, 2023

What we did

We asked for your fresh ideas for the street design options in the summer of 2023 

The community shared their ideas on the cards below and took time to review and "like" ideas shared by their neighbours.

Read our summary of engagement and what we heard in the summer of 2023 to learn about this part of the process and how we are including the community in the design.

52 ideas

Filters

Total posts: 52
There are 52 projects available.

Sorting changed to: Trending

No values available.

Selected zero tag filters.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    3 events have loaded.