Downtown Renewal - Wyndham St. and St. George's Square
A sub-project of the Downtown Infrastructure Renewal Program
The Phase 1: Wyndham Street North Reconstruction project is the first detailed design and construction project in the Downtown Infrastructure Renewal Program. This project was informed by the Wyndham Street Environmental Assessment (EA) and is the first phase identified in the upcoming Capital Implementation Plan (which outlines the construction sequencing).
This project runs in tandem with construction planning and implementation for the fulsome Downtown Infrastructure Renewal Program, and the study and design process for the Macdonell Bridge and Allan's Dam structure project.
Construction along Wellington Street East occurred in the summer of 2025 to lay the groundwork for new infrastructure along Wyndham N. and gas and power utility upgrades have been happening in sections of Downtown to prepare for the larger Construction which began March 30, 2025 and is moving through Wyndham street over the course of the next four months. Construction areas will re-open in stages as roads are complete to a level to allow traffic. All Wyndham Street construction is expected to complete in 2028.

Area of study
This part of the project focuses on the reconstruction of Wyndham Street North corridor, from approximately Farquhar Street to Woolwich Street.
Related projects on Have Your Say
Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening
Reg Russwurm, Manager, Design and Construction, City of Guelph
Vince Pugliese, Technical Manager MTE Consultants
Andrew Miller, Project Engineer, City of Guelph
Phases
St George's Square concept design comparison
What we did
In February 2025, we shared two design concepts for community discussion. These concepts were built based on ideas we heard over the summer of 2024 and will act as a starting point for a more fulsome design of the Square that we will once again bring back to the community for feedback.
Please read the summary of engagement for the preliminary design options for more information about how we brought the community into the conversation and what we heard.
Design Concept A
This Concept envisions a public open space designed as a passive park, emphasizing tranquility, accessibility, and natural beauty. The design encourages people to stop and enjoy their surroundings and relax. The design prioritizes everyday use, offering a welcoming environment for individuals and families to engage in relaxing activities. Additionally, it offers flexibility for events throughout the year.

Design Concept B
This Concept envisions the Square as a public open space designed as an active park with a stronger emphasis on hard surfaces and lasting materials, creating the perfect environment for a wide range of events and programming. The layout features expansive paved areas, flexible seating, and open spaces that can be easily transformed to accommodate festivals, performances, markets, and community gatherings.


Survey information
The Survey for this phase of the project was hosted on a separate website. Watch for the engagement summary for more information.
Upcoming and ongoing events
Past events

Event date: March 25th, 2026 from 12:00 PM to 8:00 PM.
1 Carden Street

Event date: September 18th, 2025 from 10:00 AM to 8:00 PM.
St. George's Square
1 registrant

Event date: May 1st, 2025 from 6:00 PM to 8:00 PM.
1 Carden St
1 registrant