Downtown Renewal - Wyndham St. and St. George's Square
A sub-project of the Downtown Infrastructure Renewal Program
The Phase 1: Wyndham Street North Reconstruction project is the first detailed design and construction project in the Downtown Infrastructure Renewal Program. This project was informed by the Wyndham Street Environmental Assessment (EA) and is the first phase identified in the upcoming Capital Implementation Plan (which outlines the construction sequencing).
This project runs in tandem with construction planning and implementation for the fulsome Downtown Infrastructure Renewal Program, and the study and design process for the Macdonell Bridge and Allan's Dam structure project.
Construction along Wellington Street East occurred in the summer of 2025 to lay the groundwork for new infrastructure along Wyndham N. and gas and power utility upgrades have been happening in sections of Downtown to prepare for the larger Construction which began March 30, 2025 and is moving through Wyndham street over the course of the next four months. Construction areas will re-open in stages as roads are complete to a level to allow traffic. All Wyndham Street construction is expected to complete in 2028.

Area of study
This part of the project focuses on the reconstruction of Wyndham Street North corridor, from approximately Farquhar Street to Woolwich Street.
Related projects on Have Your Say
Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Who's Listening
Colleen Gammie, Manager of Capital Planning and Growth, City of Guelph. colleen.gammie@guelph.ca
Vince Pugliese, Technical Manager MTE Consultants. vpugliese@mte85.com
Andrew Miller, Project Engineer, City of Guelph. andrew.miller@guelph.ca
Phases
Wyndham Street and St Geroge's Square revised designs
Based on the earlier work done to determine the travel lanes and pedestrian areas for Wyndham North, we shared a design that is 60% detailed to show specific elements such as pedestrian crossings, parking and patio spaces. Before we went any further with the design, we wanted to hear from you to make sure downtown's main street and St. George's Square will make us proud for generations to come.
Thanks to everyone who shared their thoughts on the designs with our project team. Read about what we heard in our Summer 2025 engagement report. Our team is hard at work revising the designs based on community feedback and adding more detail so you can get a sense for the look and feel as well as the function in our next round of design engagement coming in September 2025.

Between April 29 and May 29, 2025, we invited the community:
- Online: to review the information and give us your feedback
- In person: Drop in at city hall to meet with our project team, review the design information and share your thoughts with us. 6 to 8 p.m. on May 1, 2025 at City Hall
You can also click through past phases of this project to learn more about how we got here. You can also review some of the design images from this round of engagement below or download the full Wyndham and St George's Square design packet for more information.
Wyndham Street design concept

Wyndham street will have one lane of traffic each direction, with curb side parking, loading and bus zones, and cycle tracks separated from the road by removable bollards. Patios and pedestrian areas will be framed by gardens and trees with advanced soil structures to allow for mature growth.
St George's Square design concept

St George's Square design features
Note: the number references from the design concept image are indicated in brackets
Throughout the Square
- Vertical gateway features in each of the road entrances (2)
- Vertical light columns to highlight the corners of the square (3)
- Tree plantings (5)
- Custom raised planters (8)
- Walkway around the perimeter of the square with lighting and access to storefronts and patios (10)
- Decorative paving (14)
- Removable barriers to close Quebec and Douglas streets for events (16)
- Concrete pebble seating features (17)
- Movable seating
- Shade umbrellas (19)
Southwest section
- Rubberized Surface area with opportunities for play elements (1)
- Patio space for businesses
- The Big Heart (9)
- Shade structures

Northwest section
- Open event space
- Raised platform for events (15)
- Shade structure with overhead lighting (12)

Eastern section
- Plaza area with overhead lighting and seating (4)
- Relocated fountain with basin, centred on Quebec Street Mall entrance (6)
- Steps that provide seating opportunities (7)
- Shade structure with washroom facility and seating (11)
- A 'promenade' area with opportunities for patios and seating (17)

Upcoming and ongoing events
Past events

Event date: March 25th, 2026 at 4:00 PM to March 26th, 2026 at 12:00 AM.
1 Carden Street

Event date: September 18th, 2025 at 2:00 PM to September 19th, 2025 at 12:00 AM.
St. George's Square
1 registrant

Event date: May 1st, 2025 at 10:00 PM to May 2nd, 2025 at 12:00 AM.
1 Carden St
1 registrant