About the project

This is the fourth and final phase of the York Road Reconstruction project. In this final phase we are reconstructing York Road, from Victoria Road South the eastern city boundary this includes replacing aging sewer and water pipes and making necessary improvement to the road.

Phase four is further divided into the following stages:

  • Stage 1 - Watson Parkway to the east city limit (2025)
  • Stage 2: Victoria Road South to Industrial Street/ North Side of Watson Road (2027)
  • Stage 3 - Industrial Street to Watson Parkway (2028)

These dates are the City’s current estimate of when construction will be completed given the status of the individual projects. As with any construction project this schedule can be affected by contractor schedules, weather and any unforeseen issues that are sometimes encountered during construction.

Please note these dates may change as new information becomes available.

York Road Reconstruction Stages Map

Scope of reconstruction

The reconstruction of York Road in Stage 1 involves the following work:

  • Installation of curb and gutter between Watson Parkway and Watson Road;
  • Intersection improvements, including the addition or expansion of turning lanes;
  • Replacement of driveway aprons;
  • Installation of a storm sewer and stormwater management infrastructure, such as infiltration ponds in the boulevard;
  • Improving the existing sanitary sewer, with some replacements of existing sanitary maintenance holes and service connections;
  • New watermains; and,
  • Boulevard landscaping.

Full information about the project, the timelines, impacts and our strategies to mitigate those impacts is available in this information package.

How to participate

We're hosting an open house on Tuesday, November 24, from 6:30 to 8:30 p.m. at Ken Danby Public School in the library (525 Grange Road) to discuss Stage 2 of Phase 4 of the York Road reconstruction project. Stage 2 is scheduled for 2027 and will run from Victoria Road South to Industrial Street / the north side of Watson Road.

This open house is an opportunity to learn more about the project, upcoming construction, and ask the project team questions.

You can still view the project display boards from the stage 1 open house on April 15, 2025. If you have any questions please contact the project manager, Pacifique Nicholas.

Please note: This project began in an older version of our website. Some of the tools and information may appear different than originally designed.

Phases

Phases overview
Phase 2: Stage 1: Watson Parkway to east city limit
Stage 1: Watson Parkway to east city limit
Phase 3: Stage 2: Victoria Road South to Industrial Street/ North Side of Watson Road
Stage 2: Victoria Road South to Industrial Street/ North Side of Watson Road
Phase 4: Stage 3: Industrial Street to Watson Parkway
Stage 3: Industrial Street to Watson Parkway

Information Period

April 1, 2025 4:00 AM - May 12, 2025 4:00 AM

An open house took place on April 15, 2025. The open house boards as well as an information package are attached below.

0 questions

No results found. Please try a different filter or search term.

Filters

Total posts: 0
There are no projects available.

Sorting changed to: Trending

Events

Upcoming and ongoing events

  • Calendar with star

    Event date: November 24th, 2026 at 11:30 PM to November 25th, 2026 at 1:30 AM.

    Location

    525 Grange Road

Past events