Grove Street Reconstruction

Share Grove Street Reconstruction on Facebook Share Grove Street Reconstruction on Twitter Share Grove Street Reconstruction on Linkedin Email Grove Street Reconstruction link

Consultation has concluded

About the project

We're upgrading infrastructure on a 275 metre section of Grove Street, east of Metcalfe Street. Construction will begin in April 2025. The work will include the replacement of the watermain, storm sewers, sanitary sewers, curb and gutter, sidewalk, retaining walls, driveway aprons, landscaping and asphalt paving. This includes re-grading driveways to match the new sidewalk grade, reconstructing the sidewalks to 1.5 metres wide, rebuilding the retaining walls, providing a dedicated parking lane on the North side of the street and repaving the driving lanes.

Review the information package for more information about the project, the impacts to you and what you can expect.

Map of planned construction area for Grove Street reconstruction. Planned Construction Area 

How to Participate

Consultation has concluded. 

Thank you for joining us on Wednesday, July 24, 2024 at the Italian Canadian Club  to learn about the proposed design of the upgraded road and retaining walls and tell us your preferred staging option. To see how your feedback was used in our decisions about this project please read the engagement summary. 

Contact information

Please let us know if you have any special access needs such as a medical condition or disability so we can advise the contractor accordingly.

Additionally, if you have questions or require any of the materials to be provided in an alternative format as per the Accessibility for Ontarians with Disabilities Act (2005), please contact:

Brennan Walker, Project Manager
519-822-1260 extension 2530
Brennan.Walker@guelph.ca

About the project

We're upgrading infrastructure on a 275 metre section of Grove Street, east of Metcalfe Street. Construction will begin in April 2025. The work will include the replacement of the watermain, storm sewers, sanitary sewers, curb and gutter, sidewalk, retaining walls, driveway aprons, landscaping and asphalt paving. This includes re-grading driveways to match the new sidewalk grade, reconstructing the sidewalks to 1.5 metres wide, rebuilding the retaining walls, providing a dedicated parking lane on the North side of the street and repaving the driving lanes.

Review the information package for more information about the project, the impacts to you and what you can expect.

Map of planned construction area for Grove Street reconstruction. Planned Construction Area 

How to Participate

Consultation has concluded. 

Thank you for joining us on Wednesday, July 24, 2024 at the Italian Canadian Club  to learn about the proposed design of the upgraded road and retaining walls and tell us your preferred staging option. To see how your feedback was used in our decisions about this project please read the engagement summary. 

Contact information

Please let us know if you have any special access needs such as a medical condition or disability so we can advise the contractor accordingly.

Additionally, if you have questions or require any of the materials to be provided in an alternative format as per the Accessibility for Ontarians with Disabilities Act (2005), please contact:

Brennan Walker, Project Manager
519-822-1260 extension 2530
Brennan.Walker@guelph.ca

Consultation has concluded

If you have any questions for us about any aspect of the Grove Street Reconstruction project please feel free to ask us here. Your question and the answer will be posted to this site when we answer you. We do our best to answer in 3-5 business days. 

  • Share When will project managers visit homes individually to discuss the grade reduction of driveways, pathways, and sidewalk elevation? on Facebook Share When will project managers visit homes individually to discuss the grade reduction of driveways, pathways, and sidewalk elevation? on Twitter Share When will project managers visit homes individually to discuss the grade reduction of driveways, pathways, and sidewalk elevation? on Linkedin Email When will project managers visit homes individually to discuss the grade reduction of driveways, pathways, and sidewalk elevation? link

    When will project managers visit homes individually to discuss the grade reduction of driveways, pathways, and sidewalk elevation?

    JWFROMKW asked 4 months ago

    Further communication regarding grading impacts will take place as we progress with design details. After initial correspondence, individual site visits will be possible to discuss any additional details and concerns. 

  • Share Currently there is on street parking, where will these people park during the construction? on Facebook Share Currently there is on street parking, where will these people park during the construction? on Twitter Share Currently there is on street parking, where will these people park during the construction? on Linkedin Email Currently there is on street parking, where will these people park during the construction? link

    Currently there is on street parking, where will these people park during the construction?

    MayJ asked 4 months ago

    During construction, on street parking will not be permitted within the construction area. Residents will be expected to find other parking locations during construction. We have provided a map of nearby streets where on-street parking is permitted. You can find the map in the documents section of this page. We appreciate that this will be impactful to those who currently utilize the on-street parking currently available, and we thank residents for their patience throughout the design and construction process.

  • Share Will we be able to park in our driveway once the work is started on Facebook Share Will we be able to park in our driveway once the work is started on Twitter Share Will we be able to park in our driveway once the work is started on Linkedin Email Will we be able to park in our driveway once the work is started link

    Will we be able to park in our driveway once the work is started

    Jake asked 5 months ago

    We will strive to maintain driveway access throughout the construction process. However, there will be times where driveway access will not be possible due to construction activities especially during working hours. Residents will receive notice of these impacts ahead of time.