Exhibition Park neighbourhood infrastructure improvements
Share Exhibition Park neighbourhood infrastructure improvements on FacebookShare Exhibition Park neighbourhood infrastructure improvements on TwitterShare Exhibition Park neighbourhood infrastructure improvements on LinkedinEmail Exhibition Park neighbourhood infrastructure improvements link
About the study
We are conducting a study in the Exhibition Park neighbourhood to enhance the park's infrastructure to manage flooding, upgrade aging systems and address ongoing challenges we have heard about from the community.
We are developing recommendations to address some of the infrastructure needs while planning for long-term sustainable development and efficiencies. The study will look at upgrades to sanitary sewers, watermains, stormwater sewers, and surface works identified in the Water and Wastewater Servicing Master Plan, the Stormwater Management Master Plan, and through asset management planning.
This will include collecting field information (i.e. a topographic survey and soil information), evaluating design alternatives, and developing preliminary designs to inform detailed design and construction.
Study area
How to Participate
Thank you to those who participated in the second open house and survey. Highlights of the feedback received can be found in the open house summary.
You can also review highlights from our first open house and survey in the earlier summary report.
Since the last open house, the project team has been reviewing the input received and field investigation findings as well as conducting technical analysis to identify the preferred solution.
After careful consideration of all feedback and studies, the project team is ready to share the preferred solution for further comment and input.
Open house
Drop by the open house anytime between 6:30-8 pm on Tuesday February 11, at Victory Public School to learn about the preferred solution and share your views.
Online
If you are not able to make it to the open house, consider reviewing the project information and taking the survey starting February 11, 2025. The survey will be open until March 4, 2025.
Subscribe for updates to stay informed when these and other opportunities become available!
How to reach us
We're always here to answer your questions. Please reach out any time at colleen.gammie@guelph.ca. We'll get back to you within a few business days.
Sign up to follow the project for regular updates. Simply subscribe using the "stay informed" link in the upper right corner of this page.
About the study
We are conducting a study in the Exhibition Park neighbourhood to enhance the park's infrastructure to manage flooding, upgrade aging systems and address ongoing challenges we have heard about from the community.
We are developing recommendations to address some of the infrastructure needs while planning for long-term sustainable development and efficiencies. The study will look at upgrades to sanitary sewers, watermains, stormwater sewers, and surface works identified in the Water and Wastewater Servicing Master Plan, the Stormwater Management Master Plan, and through asset management planning.
This will include collecting field information (i.e. a topographic survey and soil information), evaluating design alternatives, and developing preliminary designs to inform detailed design and construction.
Study area
How to Participate
Thank you to those who participated in the second open house and survey. Highlights of the feedback received can be found in the open house summary.
You can also review highlights from our first open house and survey in the earlier summary report.
Since the last open house, the project team has been reviewing the input received and field investigation findings as well as conducting technical analysis to identify the preferred solution.
After careful consideration of all feedback and studies, the project team is ready to share the preferred solution for further comment and input.
Open house
Drop by the open house anytime between 6:30-8 pm on Tuesday February 11, at Victory Public School to learn about the preferred solution and share your views.
Online
If you are not able to make it to the open house, consider reviewing the project information and taking the survey starting February 11, 2025. The survey will be open until March 4, 2025.
Subscribe for updates to stay informed when these and other opportunities become available!
How to reach us
We're always here to answer your questions. Please reach out any time at colleen.gammie@guelph.ca. We'll get back to you within a few business days.
Sign up to follow the project for regular updates. Simply subscribe using the "stay informed" link in the upper right corner of this page.
We welcome your comments to inform the preliminary design of infrastructure improvements in the Exhibition Park Neighbourhood. This includes upgrades to sanitary sewers, watermains, stormwater sewers, and road works that will improve the neighbourhood.
Please complete this survey after reviewing the display boards. Once you’ve reviewed these documents, please answer the questions below. You can download the display boards to zoom into the PDF versions for a closer look at the images as you complete the survey. After careful consideration of all feedback and studies, the project team is ready to share the preferred solution for further comment and input.
Share Phase Three - Preferred Solution Survey on FacebookShare Phase Three - Preferred Solution Survey on TwitterShare Phase Three - Preferred Solution Survey on LinkedinEmail Phase Three - Preferred Solution Survey link
We welcome your comments to inform the preliminary design of infrastructure improvements in the Exhibition Park Neighbourhood. This includes upgrades to sanitary sewers, watermains, stormwater sewers, and road works that will improve the neighbourhood.
Please complete this survey after reviewing the display boards. Once you’ve reviewed these documents, please answer the questions below. You can download the display boards to zoom into the PDF versions for a closer look at the images as you complete the survey. Community input will be considered along with results from technical field investigation and analysis to arrive at the final preferred option.
All comments will be part of the project record (except for personal information).
Share Phase Two - Potential Options Survey on FacebookShare Phase Two - Potential Options Survey on TwitterShare Phase Two - Potential Options Survey on LinkedinEmail Phase Two - Potential Options Survey link