Exhibition Park neighbourhood infrastructure improvements

Share Exhibition Park neighbourhood infrastructure improvements on Facebook Share Exhibition Park neighbourhood infrastructure improvements on Twitter Share Exhibition Park neighbourhood infrastructure improvements on Linkedin Email Exhibition Park neighbourhood infrastructure improvements link

About the study

We are conducting a study in the Exhibition Park neighbourhood to enhance the park's infrastructure to manage flooding, upgrade aging systems and address ongoing challenges we have heard about from the community.

We are developing recommendations to address some of the infrastructure needs while planning for long-term sustainable development and efficiencies. The study will look at upgrades to sanitary sewers, watermains, stormwater sewers, and surface works identified in the Water and Wastewater Servicing Master Plan, the Stormwater Management Master Plan, and through asset management planning.

This will include collecting field information (i.e. a topographic survey and soil information), evaluating design alternatives, and developing preliminary designs to inform detailed design and construction.

Study area

How to Participate

Thank you to those who participated in the first open house and survey. Highlights of the feedback received can be found in the summary report.

Since the last open house, the project team has been conducting investigations to gather field data and fill data gaps about the land, conditions, utilities and trees, as well as thorough archeology and heritage assessments.

During this time, the project team will identify and evaluate possible solutions.

The project team has considered your input, technical analysis, and field investigations and is ready to share some preliminary solution options for further input and feedback.

Open house

Thank you for attending our open house Tuesday, October 8th, at City Hall to learn about the solution options and share your views.

Online

If you couldn't join us in person, the open house boards will be posted here and you can take the survey between October 8 to November 6.

Subscribe for updates to stay informed when these and other opportunities become available!

How to reach us

We're always here to answer your questions. Please reach out any time at colleen.gammie@guelph.ca. We'll get back to you within a few business days.

Sign up to follow the project for regular updates. Simply subscribe using the "stay informed" link in the upper right corner of this page.

About the study

We are conducting a study in the Exhibition Park neighbourhood to enhance the park's infrastructure to manage flooding, upgrade aging systems and address ongoing challenges we have heard about from the community.

We are developing recommendations to address some of the infrastructure needs while planning for long-term sustainable development and efficiencies. The study will look at upgrades to sanitary sewers, watermains, stormwater sewers, and surface works identified in the Water and Wastewater Servicing Master Plan, the Stormwater Management Master Plan, and through asset management planning.

This will include collecting field information (i.e. a topographic survey and soil information), evaluating design alternatives, and developing preliminary designs to inform detailed design and construction.

Study area

How to Participate

Thank you to those who participated in the first open house and survey. Highlights of the feedback received can be found in the summary report.

Since the last open house, the project team has been conducting investigations to gather field data and fill data gaps about the land, conditions, utilities and trees, as well as thorough archeology and heritage assessments.

During this time, the project team will identify and evaluate possible solutions.

The project team has considered your input, technical analysis, and field investigations and is ready to share some preliminary solution options for further input and feedback.

Open house

Thank you for attending our open house Tuesday, October 8th, at City Hall to learn about the solution options and share your views.

Online

If you couldn't join us in person, the open house boards will be posted here and you can take the survey between October 8 to November 6.

Subscribe for updates to stay informed when these and other opportunities become available!

How to reach us

We're always here to answer your questions. Please reach out any time at colleen.gammie@guelph.ca. We'll get back to you within a few business days.

Sign up to follow the project for regular updates. Simply subscribe using the "stay informed" link in the upper right corner of this page.

  • CLOSED: This survey has concluded.

    Welcome to the Survey!

    We welcome your comments to inform the preliminary design of infrastructure improvements in the Exhibition Park Neighbourhood. This includes upgrades to sanitary sewers, watermains, stormwater sewers, and road works that will improve the neighbourhood.

    Please complete this survey after reviewing the display boards. Once you’ve reviewed these documents, please answer the questions below.  You can download the display boards to zoom into the PDF versions for a closer look at the images as you complete the survey. Community input will be considered along with results from technical field investigation and analysis to arrive at the final preferred option.

    All comments will be part of the project record (except for personal information).

    Share Phase Two - Potential Options Survey on Facebook Share Phase Two - Potential Options Survey on Twitter Share Phase Two - Potential Options Survey on Linkedin Email Phase Two - Potential Options Survey link
Page last updated: 07 Nov 2024, 08:23 AM